Workshop 08 / Caravanserai

Location: Silvertown Way, Canning Town, London

Client: Newham Council

Facilitators: Alex Scott Whitby, Cany Ash

 .

INTRODUCTION: detailed information can be found in the pdf “Design and Access Statement (Download)

KEY RISKS TO CONSIDER: The ‘ANNEX 1’ risk assessment is a document that asks you, the team to collaborate in anticipating the activities you are about to engage in, and to develop a strategy to deliver a safe and effective outcome. This is not a chore – it is core – an architect who cannot establish a safe design is not an architect. Complete the risk assessments online as a first draft via the blog and upload for review on the 19th September – as the design progresses, the risk assessment will be revised and uploaded as Revision A latest Thursday 23rd September.

Key risk considerations for Workshop 8 CARAVANSERAI: Responsibility for the laser cutter and its safe operation; travel to and from Trinity Buoy Wharf; modelmaking and wood assembly.

 .

WORKSHOP BLOG:

constructionweek2011.wordpress.com is the main platform for the Construction week overview and organization. Here you can find the workshops’ briefs, blank forms to fill when required, and documents regarding the single workshops.

You are asked to upload the main documents referring to your workshop in the Main Blog. (Main DOCs = Main Blog)

Each workshop is also asked to set up a personal blog where uploading photographs and comments every day. (Photographs, comments = Single WSPs Blogs). To know how setting up YOUR BLOG and use the MAIN BLOG, please visit www.constructionweek2011.wordpress.com at the section THE BLOG.

.

DOWNLOAD

Design and Access Statement / Wsp08

Sites / Wsp08

Project / Wsp08

Example of works1 / Wsp08

Example of works2 / Wsp08

Example of works3 / Wsp08

Example of works4 / Wsp08

Alex Scott Whitby blurb / Wsp08

Alex Scott Whitby2 / Wsp08


%d bloggers like this: